Building Update 11/12/09

Creative Sound and Lighting has been steadily working on the stage lighting and well as hanging the projectors. They have also begun installing the video cameras. Additionally, Jimmy's crew has started installing the trim and doors in certain areas of the building. As always, please keep the building program and financing in your prayers.

Thursday, November 5, 2009

Building Update 11/05/2009

The sprinkling system contractor (Brewer) has completed their work of adjusting the sprinker head to the ceiling grid and the ceramic tile is continuing to be installed. The larger tiles (18 inch) are stacked in the foyer and will be installed soon. I talked with our Project Manager, Jimmy Dillon and his men will start installing the interior doors on Monday. Please keep praying for our building program.

Monday, November 2, 2009

Building Update 11/02/2009

Ceramic Tile is being installed in the restrooms and the sprinkling system installer (Brewer) was draining down the system so that they can adjust the sprinkler heads to match the ceiling grid. Brewer will be on site all day on Tuesday.

Sunday, November 1, 2009

Updated Photos

Above is another photo of the Worship area, this time from the left side of the room. You can see where the screens are located on either side of the stage and the frame for the screen on the back wall.
These are the interior doors leading into the worship area from the hallways.

Two of the four powered sub-woofers located under the stage.


The foyer area with the ceiling grid completed.



The parking lot on the Loop side of the building is now complete except for the painted lines.





Building Update 11/01/2009

Sorry that I haven't been keeping everyone up to date on the building progress, but I've been under the weather this week. The parking lot next to the building has been paved and ceiling grid is complete. All of the lights and HVAC in the grid is complete. Just waiting on the sprinkling system contractor to come and adjust all of the sprinkler heads to the level of the grid. We are scheduled to have a painting party today, so everyone should come out and pitch in. Hope to post some pictures later today.