Guess I jumped the gun on some of the contractors last week. This week the glass contractor will be in to finish all of the outside doors along with the main entrance glass and the ceiling contractor will be in to lay in the drop ceiling grid. Once the grid is installed, other contractors will be back in to install the ceiling lights in the grid along with the HVAC people to install the deflectors in the ceiling. Additionally, the company that installed the sprinkler system will adjust the sprinkler heads to the ceiling grid. Within the next couple of weeks, the concrete slabs at each entrance will be poured along with covers over some of the entrances. Once the concrete slabs are poured, then the asphalt contractor will be able to lay the asphalt on the limited parking lot next to the new builing. These spaces will be limited to Handicap and Visitor parking.
Creative Sound and Lighting continues to work on site and will be installing the drops for the video cameras as well the frames for the stage lighting.
Please pray for God's continued blessing on the building progress.
Saturday, October 10, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment