Building Update 10-14-2009
All of the exterior doors are now in place as well as the glass above the main entrance. The drop ceiling contractor is on site and has completed the grid along the hallway next to the loop and is starting the grid on the opposite hallway. Creative Sound and Lighting has completed the drops for the 2 video cameras and is now working on the stage lighting. It's been an exciting week. Hope to upload some new pictures later today.
Saturday, October 10, 2009
Building Update 10/10/09
Guess I jumped the gun on some of the contractors last week. This week the glass contractor will be in to finish all of the outside doors along with the main entrance glass and the ceiling contractor will be in to lay in the drop ceiling grid. Once the grid is installed, other contractors will be back in to install the ceiling lights in the grid along with the HVAC people to install the deflectors in the ceiling. Additionally, the company that installed the sprinkler system will adjust the sprinkler heads to the ceiling grid. Within the next couple of weeks, the concrete slabs at each entrance will be poured along with covers over some of the entrances. Once the concrete slabs are poured, then the asphalt contractor will be able to lay the asphalt on the limited parking lot next to the new builing. These spaces will be limited to Handicap and Visitor parking.
Creative Sound and Lighting continues to work on site and will be installing the drops for the video cameras as well the frames for the stage lighting.
Please pray for God's continued blessing on the building progress.
Creative Sound and Lighting continues to work on site and will be installing the drops for the video cameras as well the frames for the stage lighting.
Please pray for God's continued blessing on the building progress.
Wednesday, October 7, 2009
Outside Walls
Sunday, October 4, 2009
Week of October 4th
Lord willing, this week we will see lots of activity on site. The building contractor will be back to finished the soffit along the roof line of B Street, Creative Audio and Lighting will continue to work on the A/V system, the ceiling contractor will beging to lay in the grid for the drop ceiling in the hall ways, foyer and all other rooms excluding the auditorium, and finally, the glass contractor will be here to finished all of the outside entrances. Wow, don't blink or you might miss something.
Wednesday, September 30, 2009
Let The Speakers Speak
Creative Audio and Visual started their six week install of the audio/visual gear. The first week saw the addition of the boxes installed on the stage floor, all the wiring to the boxes and conduit between the boxes and the amp room.
This week, Creative installed the a bundle of wire between the sound booth and the amp room and "flew" the speakers that you see in the picture above and if all goes well, next week will bring the supporting structures for the stage lighting.
Updated pictures
Friday, June 26, 2009
Answered Prayer
Thursday, June 18, 2009
Update June 18, 2009
Wednesday, May 27, 2009
Sunday, April 12, 2009
Tuesday, March 24, 2009
Tuesday Update
Framing continues
Plumbing work picks back up
Duct work continues to go on, in, up and down.
Also, the electrical contractor has been doing some preliminary work as too has the sprinkler system contractor. We're ordering the plumbing fixtures and baptistry. And the ceiling design is underway. Busy, busy, busy.